DocumentsDate added
Between 23 February and 3 March 2009 three Regional Workshops were held on safeguards as defined in the Project Implementation Manual (PIM). To strengthen the capacities to handle safeguard measures approx. one hundred provincial staff, working with safeguard issues were brought together in these workshops. The participants were selected by respective ExCom’s in consultation with NCDD.
Technical Cooperation (TC) and Capacity Development in Support of D&D- Phase 1: Report TC personnel Arrangements
A Fiscal Model for a 2-tier local authority: District/Commune BASELINE REPORT on Responsiveness of the Commune/Sangkat Development Plan and the Commune/Sangkat Investment Program to the Commune Socio-Economic development Needs and the CMDGs- A Study
BASELINE REPORT on Increased Accountability Mechanisms – Baseline and Progress Monitoring Surveys
A Fiscal Model for a 2-tier local authority: District/Commune Mid-Term Review of the Project to Support Democratic Development Through Decentralisation and Deconcentration (PSDD)